National Plane for Research-Development and Innovation II - PNCDI2
Contract no. 21-026 from 14.09.2007 The rise of energy’s efficiency of turboengines in cogenerative cycle using the pellicular cooling and special termoresistent covering
Contract no. 21-071 from 14.09.2007 The rise of energy efficiency of the screw compressor instalations, using for powering a thermic engine with electronic command and using natural gases as fuel
Contract no. 21-061 from 14.09.2007 Screw Turbine Recovery System of Power Energy from Natural Gas Results of Expansion Energy
Contract no. 21-056 from 14.09.2007 Modern ways to reduce the polution and to increase the efficiency of gas-turbine cogneration plants and turbo-compressors for natural gas
Contract no. 21-052 from 14.09.2007 New ecological method to produce electric energy by extracting heat from deep wells
Contract no. 71-036 from 18.09.2007 Inner passenger cabin noise reduction using optimized fuselage structure
Contract no. 81-027 from 18.09.2007 The Analysis and Control of Thermoacoustic Instabilities Inside the Combustion Chamber of an Aircraft Engine
Contract nr. 51-043 din 14.09.2007 Instalatie de generare a cetii pentru protectia plantelor contra factorilor nefavorabili ai mediului, utilizand camere de ardere pulsatorie
Contract nr. 51-063 din 14.09.2007 Generator de aerosoli pentru protectia plantelor impotriva bolilor si daunatorilor conceput si realizat pe baza tehnologiilor utilizate in industria aeronautica
Contract nr. 81-024 din 18.09.2007 Elaborarea, implementarea şi validarea experimentală pe un model funcţional original de cameră de ardere a unui algoritm de calcul numeric pentru simularea curgerilor turbulente – reactive complexe
Contract nr. 21-002 din 18.09.2007 Cercetari de realizare soft CFD si model functional original sistem postcombustie, cu validarea rezultatelor
Contract nr. 71-077 din 18.09.2007 Sistem integrat CAD–CAM–CAE pentru piese cu forme complexe din structura turbomotoarelor
Contract no. 32-163 from 01.10.2008 Research on establishing the causes to the increase noise and vibration level in technologic units as: regulation-measurement, pipe control units and natural gas compressors
Contract nr. 72-181 din 2008 Optimizarea aerodinamica a nacelei motoarelor turbopropulsoare in vederea cresterii sigurantei zborului si a reducerii nivelului de poluare
Contract no. 22-108 from 2008 Integrated gas turbine-afterburner system to decrease NO x emissions and increase the efficiency of cogenerative plants working on gas fuels
Contract no. 59/CP/I2007 - from 12.09.2007 Research center - the development of innovative technologies for the realization of three-dimensional structures profiled in aerospace
Contract no. 22-114/2008 The increase of the energetic efficiency of the turboengines used in the cogenerative cycle by development of new advanced Ti-base materials and special surface coatings
Contract no. 32-122/2008 Modern, performant, low-grade pollution technology destined to achieve hard surfaces for the aircraft components and turboengines used to produce energy
Contract no. 82-090/2008 Compressor with compression ratio greater than 9, in one stage
Contract nr. 22-117/2008 Cresterea eficientei si fiabilitatii instalatiilor de gaz COMbustie si DEMaraj pentru centrale cogenerative si grupuri turbocompresoare de puteri medii
Contract nr. 22-109/2008 Cresterea gradului de utilizare a resurselor energetice prin realizarea unei instalatii de comprimare pentru recuperarea gazelor naturale din spatiul inelar al sondelor petroliere
Contract no. 81-016/2007 Integrated security system for ventilation installations from strategical national interest buildings in case of chemical or biological attack